Dissolve the issue of no-sewage system
- Promote revision of the sewage plan to an efficient process by considering the changes of social trends such as strict financial condition and population decrease, etc.
- For construction, dissolve the issue of no-sewerage system within 10 years in the population concentrated districts. (Support system for dissolving the issue of no-sewage system )
- By corresponding to the actual situation of the districts, adopt low cost sewerage construction method along with strengthening collaboration with rural community sewerage and septic-tank with aeration system, etc.
Current condition of the Sewage Service
Condition of sewerage service on a city level (end of 2007)i
Closed up imagej
Concept of sewage facilities construction in Japans
Revision of the sewage plan and priority supported districts
Collaboration with other sewage treatment facilities
Sewage treatment plan until today / New sewage treatment plan
Positive introduction of new construction method through social experiments
Exposed piping using existing conduits and private land
Example of adopting the prefabricated style membrane isolation process for sewage
Effectiveness of facilities
Joint maintenance business for sewage treatment facility (MICS)
- Conduct construction for facilities that numerous swage facilities such as rural community sewerage, integrated septic tanks with aeration system can use jointly.
Joint maintenance business for sewage treatment facility (MICS)
Example of Kamigori town of Hyogo prefecture
Quick project for no-sewerage system areas
- Introduce a new construction method where quick and low cost construction is possible
Outline chart for construction
Example of exposed piping (Mashiki-machi, Kumamoto prefecturej