HOME  >> English top >> sewerage >> Dissolve the issue of no-sewage system

sewerage

Dissolve the issue of no-sewage system

  • Promote revision of the sewage plan to an efficient process by considering the changes of social trends such as strict financial condition and population decrease, etc.
  • For construction, dissolve the issue of no-sewerage system within 10 years in the population concentrated districts. (Support system for dissolving the issue of no-sewage system )
  • By corresponding to the actual situation of the districts, adopt low cost sewerage construction method along with strengthening collaboration with rural community sewerage and septic-tank with aeration system, etc.

Current condition of the Sewage Service

 

Condition of sewerage service on a city level (end of 2007)
Condition of sewerage service on a city level (end of 2007)iClosed up imagej

 

Concept of sewage facilities construction in Japan
Concept of sewage facilities construction in Japans
Revision of the sewage plan and priority supported districts
Revision of the sewage plan and priority supported districts

 

Collaboration with other sewage treatment facilities

 

Sewage treatment plan until today
New sewage treatment plan
Sewage treatment plan until today / New sewage treatment plan

 

Positive introduction of new construction method through social experiments

 

Exposed piping using existing conduits and private land
Exposed piping using existing conduits and private land
Example of adopting the prefabricated style membrane isolation process for sewage
Example of adopting the prefabricated style membrane isolation process for sewage

 

Effectiveness of facilities

Joint maintenance business for sewage treatment facility (MICS)
  • Conduct construction for facilities that numerous swage facilities such as rural community sewerage, integrated septic tanks with aeration system can use jointly.
Joint maintenance business for sewage treatment facility (MICS)
Joint maintenance business for sewage treatment facility (MICS)
Example of Kamigori town of Hyogo prefecture
Example of Kamigori town of Hyogo prefecture

 

Quick project for no-sewerage system areas

  • Introduce a new construction method where quick and low cost construction is possible
Outline chart for construction
Outline chart for construction
Example of exposed piping (Mashiki-machi, Kumamoto prefecturej
Example of exposed piping (Mashiki-machi, Kumamoto prefecturej